MAHMOOD ENGINEERING
Home About Services Projects Clients Get an Estimate Contact Us

MILKING PARLOUR

Clean. Fast. Efficient.
← Back to Dairy Sheds

Milking Parlour Shed Construction

Dairy Farm Construction in Pakistan

Pioneers of PEB Dairy Shed in Pakistan

A well built milking parlour saves hours of labour every day and protects milk quality. We construct the full parlour building, from the holding yard and pit to drainage, so your equipment supplier can install straight away.

HerringboneParallel, rotary ready
Pit + holdingComplete layout
RubberisedNon slip floors
6 to 12 weeksTypical build time
Get an EstimateCall +92 329 0093249

What is a milking parlour shed?

The parlour is the heart of the dairy farm. Cows must enter, be milked and leave calmly, so the building needs the right pit depth, wide entry and exit lanes, strong equipment mounting points and fast drainage for washing.

We build the parlour shed, holding area, return lanes and wash down floors to the dimensions your milking system needs. We work with your equipment supplier's drawings so everything fits first time.

Best suited for

  • Herds of 50 animals and above
  • Farms moving from bucket milking to a parlour
  • New commercial dairy farms
  • Farms expanding to more milking points
  • Owners who want faster milking with fewer workers

What is included

  • Parlour steel shed with roof and ventilation
  • Milking pit with correct depth and drainage
  • Holding area with crowd gate provision
  • Entry, exit and return lanes
  • Equipment mounting and pipe supports
  • Wash down floors with strong slope to drain
  • Milk room and utility room
  • Lighting and water points

How we do it, A to Z

A clear process with a named engineer at every stage, so you always know what happens next.

Site visit and requirement study

Our engineer visits your land, checks soil, drainage, wind direction and access roads, and records your herd size, milking routine and expansion plans.

Day 1 to 3

Layout and concept design

We plan feeding lanes, resting area, alleys, water points, milking route and manure flow so animals and workers move without crowding.

Week 1

Structural design and drawings

Portal frames, purlins, bracing and foundations are designed for Pakistan wind and seismic loads. You receive approved drawings before steel is cut.

Week 1 to 2

Quotation and agreement

A clear bill of quantities, material grades and payment schedule. No hidden items, and every change is priced before it is built.

Week 2

Foundation and civil works

Excavation, footings, plinth beams and floor preparation, with anchor bolts set to exact positions for the steel frame.

Week 2 to 4

Fabrication in our factory

Columns, rafters and purlins are cut, welded and painted or galvanised at our Lahore factory under quality control, then marked for fast assembly.

Week 2 to 5

Erection and roofing

Frames are lifted and bolted, purlins and bracing fixed, then roof sheets, ridge ventilation and roof lights are installed.

Week 4 to 7

Finishing, inspection and handover

Floors, mangers, rails, water troughs and drainage are completed. We inspect every connection and hand over with drawings and maintenance advice.

Week 6 to 8

See it in 3D

Rotate the milking parlour shed, zoom in, or walk inside along the feeding lane.

Drag to rotate · Scroll to zoom
The 3D view needs WebGL, which this device does not support. Please see the photos above.

Before and after

Drag the line to compare the empty site with the finished project.

Before: Empty landBefore construction: Empty land
After: Completed milking parlourAfter construction: Completed milking parlour
BEFOREAFTER
↔

Common Questions About Milking Parlour Shed

Which milking parlour type should I choose?+

Herringbone suits most farms up to a few hundred cows. Parallel parlours give faster throughput for larger herds. Rotary parlours are for very large herds. We help you choose based on herd size and labour.

Do you supply the milking machines?+

We build the parlour structure and floors and prepare mounting points. Milking machines come from your chosen equipment supplier, and we coordinate the installation.

How big should the holding area be?+

As a rule it should hold the cows for one full milking group with comfortable space per animal. We calculate it from your herd size and parlour size.

Can a parlour be added to an existing farm?+

Yes. We plan cow movement from your existing sheds so the parlour fits without disturbing daily routine.

Ready for your Milking Parlour Shed?

Tell us about your farm and herd. Our team will reply within one working day.

Dairy Farm Photo
Get an Estimate